MISO
Midcontinent Independent System Operator
Central US • America/Chicago
Live Grid Data
Updated just nowCurrent Load61,517 MW
Real-Time LMP—
Renewables34.6%
Fuel Mix
Wind21,273 MW
Gas17,682 MW
Coal11,684 MW
Nuclear9,771 MW
About Grid Data
What is an ISO/RTO?
- An Independent System Operator (ISO) or Regional Transmission Organization (RTO) manages the electric grid and wholesale electricity markets in their region. They ensure reliable power delivery while facilitating competitive energy trading.
What does LMP mean?
- Locational Marginal Price (LMP) is the cost of supplying the next megawatt of electricity at a specific location on the grid. It includes energy cost, transmission congestion, and losses. LMPs are the basis for wholesale electricity pricing.
How often is grid data updated?
- Grid data updates every 5 minutes during operating hours. This includes current load, generation mix, and real-time prices. Some data points may have slight delays depending on the ISO's publication schedule.
What is renewable penetration?
- Renewable penetration shows what percentage of current electricity generation comes from renewable sources like wind and solar. Higher penetration can affect grid stability and electricity prices.