⚡
CAISO
California Independent System Operator
California • America/Los_Angeles
Live Grid Data
Updated 3m agoCurrent Load30,749 MW
Forecast32,165 MW(-4.4%)
Real-Time LMP—
Renewables89.0%
Fuel Mix
Solar20,403 MW
Wind5,116 MW
Gas1,165 MW
Nuclear2,281 MW
Latest CAISO News
2 articlesElectronX Launches MISO and CAISO Contract Suites for Intraday Power Hedging
PR Newswire2d ago
PCI Energy Solutions Powers Successful Launch of First CAISO EDAM Wave
This post highlights PCI Energy Solutions' role in the successful launch of CAISO's Extended Day-Ahead Market, which is significant for market participants in California.
PR Newswire20d ago
About Grid Data
What is an ISO/RTO?
- An Independent System Operator (ISO) or Regional Transmission Organization (RTO) manages the electric grid and wholesale electricity markets in their region. They ensure reliable power delivery while facilitating competitive energy trading.
What does LMP mean?
- Locational Marginal Price (LMP) is the cost of supplying the next megawatt of electricity at a specific location on the grid. It includes energy cost, transmission congestion, and losses. LMPs are the basis for wholesale electricity pricing.
How often is grid data updated?
- Grid data updates every 5 minutes during operating hours. This includes current load, generation mix, and real-time prices. Some data points may have slight delays depending on the ISO's publication schedule.
What is renewable penetration?
- Renewable penetration shows what percentage of current electricity generation comes from renewable sources like wind and solar. Higher penetration can affect grid stability and electricity prices.