Greenvolt Power and Bedrock Renewables have acquired three operational wind projects in Iowa, totaling 116 MW of installed capacity. The projects include Top of Iowa Wind (80 MW), Crosswind (21 MW), and Hardin Hilltop Wind (15 MW). This acquisition aims to enhance their U.S. presence and supports future repowering efforts to improve efficiency and extend operational life.
Sign in to access complete coverage, AI analysis, and related companies.
Sign In to Continue